Project and fleet visibility
Structure vehicle and asset views around depots, projects and responsible teams, with clear source ownership.
Explore capabilityBring works vehicles, mobile plant and contractor fleet context together across highways, civil engineering and distributed infrastructure programmes.
Discuss your requirementsExplore the capabilitiesInfrastructure
Decision framework • signals depend on connected devices and available data.
Infrastructure programmes spread people and equipment across changing work zones. Project teams need to know which assets are assigned, which are available and who owns an exception. Fleetly connects available fleet data with accountable workflows while project, permit and worksite systems retain their specialist responsibilities.
Build a solution around the data you can trust and the actions your teams need to take.
Structure vehicle and asset views around depots, projects and responsible teams, with clear source ownership.
Explore capabilityReview available movement and arrival records to support coordination between transport and site teams.
Explore capabilityReview road and worksite events using compatible cameras and operational context.
Explore capabilityConnect open defects and planned service with the next project allocation and handover.
Explore capabilityA practical sequence for your team, with a named owner at each handover.
Assign asset, project and responsible contractor.
Review journey and arrival context.
Monitor available data and manage exceptions.
Close defects and update responsibility.
Feed recorded outcomes and unresolved actions into the next operating period.
Use a representative baseline and comparable operating periods. These are suggested measures, not claims of achieved customer results.
Required assets available and released ahead of the planned mobilisation.
Asset transfers lacking an agreed owner or complete handover record.
Time from an assigned fleet exception to recorded completion.
Agree equipment, data ownership and acceptance criteria before scaling. A representative pilot should prove the complete workflow, including exceptions and handover.
Use the fleet rollout workbookAgree contractor data-sharing permissions and identity mapping.
Keep site boundaries and project assignments current as works move.
Define who owns defects and evidence when an asset changes project or contractor.
Potentially, with agreed permissions, compatible interfaces and clear ownership of each asset and data source.
Site definitions can be planned around changing works, with an owner responsible for keeping them accurate.
No. It provides fleet context and workflows; project plans, permits and specialist records remain in the designated systems unless an integration is agreed.
Discuss your fleet, existing technology and the decisions you want to improve.